DOOR
Certified fire doors,
installed & maintained
across London.
Supply, installation, inspection and remedial works for FD30 & FD60 fire doorsets, fully documented, third-party accredited, and compliant with the Fire Safety (England) Regulations 2022.
A complete fire door service, under one accredited roof.
Supply & Installation
Factory-rated FD30 and FD60 doorsets supplied and fitted by certified installers, complete with compliant hardware, seals and signage.
Inspections & Audits
Structured surveys against the 5-point check, with photographic evidence and a prioritised action register for every door.
Remedial Works
Gap adjustments, seal replacement, hardware upgrades and re-hanging, bringing failing doorsets back to certified performance.
Maintenance Contracts
Scheduled quarterly and annual checks for communal and flat-entrance doors, keeping your portfolio continuously compliant.
Compliance Surveys
Portfolio-wide condition surveys for responsible persons, mapped to the Fire Safety (England) Regulations 2022.
Not sure what you need?
Send us your building details and we'll recommend the right scope and turn around a fixed quote.
A fire door only works if it's compliant, and the law now requires proof.
Under the Fire Safety (England) Regulations 2022, responsible persons for buildings above 11 metres must carry out routine checks of fire doors and keep records. A door with worn seals, oversized gaps or the wrong hardware can fail in minutes.
We make compliance demonstrable: every door we touch is documented, evidenced and signed off, so you're audit-ready, not exposed.
From survey to sign-off in five steps.
Survey & assessment
We inspect every doorset and document its current condition.
Detailed quote (RFQ)
A fixed, itemised quotation with scope and lead times.
Supply & install
Certified installers fit rated doorsets with minimal disruption.
Certification & sign-off
Full documentation pack and compliance certificates issued.
Ongoing maintenance
Scheduled re-inspections keep you compliant year-round.
Third-party certified at every stage.
From failed inspection to certified compliant.
Drag the slider to compare a non-compliant doorset before and after remedial works.



Property managers, landlords & contractors.
"They surveyed 180 doors across our blocks and gave us a clear, prioritised register. We finally have the evidence pack our auditors were asking for."
"Quick to quote, certified installers, and everything documented. Remedial works were done with almost no disruption to residents."
"We use them as our fire door subcontractor on fit-outs. Reliable lead times and the certification always lines up with building control."
Fire door FAQs
For residential buildings above 11m, communal fire doors should be checked quarterly and flat-entrance doors on a best-endeavours basis at least annually. Commercial premises follow their fire risk assessment, but six-to-twelve-monthly is typical.
FD30 doorsets provide 30 minutes of fire resistance and FD60 provide 60 minutes. The rating required depends on the building, escape routes and your fire risk assessment, we'll advise the correct spec for each opening.
Many issues, gaps, seals, hinges, closers and signage, can be remediated to restore certified performance. Where the leaf or frame is damaged or non-rated, full replacement is the compliant route. Our survey tells you which applies, door by door.
Yes. Every installation and remedial job comes with a full evidence pack, photos, product data sheets, certificates and a compliance register, so responsible persons can demonstrate compliance during audits.
We operate across Greater London, covering every borough inside the M25, covering residential blocks, commercial premises, HMOs, hotels, healthcare and education sites.
Send your building details through the RFQ form and we'll typically respond within one to two working days. For larger portfolios we'll arrange a site survey and return an itemised, fixed quotation.
Tell us about your building.
Share a few details and we'll come back with the right scope and a fixed quotation, usually within one to two working days.
Request received
Thanks, we'll review your building details and come back with a quote within one to two working days.